CONVERSION OF ADMINISTRATION OFFICE TO LIVING ACCOMMODATION AT MARGHAM GAS PLANT

ClientsDubai Petroleum Establishment
Contract value AED 1,203,574.00
Scope includes Demolition works, sound and fireproof drywall partition system and false Ceiling works, toilet blocks including all sanitary Fittings, Conversion of Office Building and Open Space into Bedrooms, domestic drainage system. Supply and Installation of Sub-Main Distribution Board, Distribution Board with Fire Interlock and wire laying of 50 sq. mm cable from Main DB to SMDB of length 120m. Supply and installation of HVAC System, fresh air supply system, Installation of IT cable network and devices, Supply & Installation of Emergency Light System with Monitoring Panel, sprinkler system and Fire alarm system including fire and gas control panel Integration with DCS.

We are trusted by world’s leading companies

Copyright © 2018 Poweron. All Rights Reserved. Designed By Riolabz